Specialist implementation and auditing of GSMA SAS, SOC, UL 2050, ASTM F1233 and PCI DSS.
AACL is one of the region's specialist consultancies for security certification schemes that combine physical and logical control requirements. Critical for security printers, SIM manufacturers, payment ecosystems and monitored high-security facilities.
Security certification schemes such as GSMA SAS, UL 2050 and PCI DSS impose demanding, prescriptive controls that span physical premises, personnel screening, information security, production processes and supply chain governance. AACL provides end-to-end implementation and audit readiness for these programmes.
Our consultants have supported certification programmes for security printers, SIM and eSIM manufacturers, payment processors and high-security storage facilities. We understand the operational realities of running certified facilities. From clean-room controls to CCTV retention and secure destruction.
We provide both implementation (design, remediation, evidence packs) and independent second-party auditing to prepare organisations for scheme audits with confidence.
The conditions that bring organisations to AACL.
- 01Onerous physical control requirements (LPS 1175, UL 2050) with long lead times
- 02Complex evidence expectations across production, personnel and IT
- 03Coordination between architects, security integrators, HR and IT
- 04Cost pressure to right-size controls without compromising certification
- 05Maintaining continuous compliance between annual audits
A structured, evidence-based delivery model.
Scheme scoping
Interpret scheme requirements against your production, product and customer footprint.
Design & remediation
Physical, procedural and technical control design with integrator coordination.
Evidence engineering
Structured evidence packs mapped one-to-one against auditor checklists.
Mock audit
Independent readiness audit simulating the certification body assessment.
Certification support
On-site support during scheme audit and non-conformity closure.
Sustainment
Annual surveillance readiness, KPI monitoring and control assurance.
What you receive.
- Scheme applicability statement
- Control design and remediation plan
- Auditor-mapped evidence pack
- Mock audit report
- Certification audit support
- Annual surveillance readiness pack
